Sustainable Mobility. As a component of its obligation to supportability and the climate, and as a viable method for battling environmental change. The organization needs to advance and lead the progress towards effortless portability and the zap of transport.

Sustainable Mobility Plan

The Sustainable Mobility Plan is essential for the responsibility made by the organization in its Sustainable Management Policy. Which requires the reception of approaches that favour the maintainable abuse of the gathering’s corporate reason. The goals of this drive are to decrease discharges, advance energy effectiveness. Work on the personal satisfaction of individuals in the region where the gathering works and bring issues to light among representatives.

Main Sustainable Mobility Initiatives

Last Big Deals

The Iberdrola Group plays a vital role in three micro-projects currently presented from Spain for European Next Generation funds to develop electric mobility. The so-called Strategic Projects for Economic Recovery and Transformation  (PERTE) to create the Electric and Connected Vehicle  (PERTE VEC).

On the one hand, the company participates in the Future: Fast Forward consortium , led by SEAT and the Volkswagen Group and made up of 62 companies that cover the entire electric vehicle value chain. Iberdrola’s contribution to the project focuses on the decarbonization of the SEAT factories in Martorell and the Volkswagen factories in Pamplona; the development of photovoltaic self-consumption projects for said manufacturing plants; and the development of innovative solutions for intelligent recharging and the use of second-life batteries for these vehicles.

Smart Mobility Plan

Inside the Smart Mobility Plan system. The organization of almost 150,000 re-energizing focuses for electric vehicles is incorporate — increasing the underlying arrangement by six — and a phenomenal rate to accuse expressed vehicles of power from green sources. A program pointed basically at families’ External connection opens in another window. Also, organizations need to offer this support to their workers or clients and urban public spaces.

In September 2020, Iberdrola marked a green advance with the Official Credit Institute (ICO) for a measure of 59.4 million for establishing 2,500 charging focuses on open streets in Spain and Portugal. Likewise, the gathering’s portability charge plan additionally has the help of the European Commission, through a 13 million euro award granted by the Innovation and Networks Executive Agency (INEA) inside the CEF Transport Blending call Facilities. A guide that will assist with funding the establishment of 2,339 quick, super-quick and super quick charging focuses in Spain and Portugal directs close toward the trans-European vehicle organizations (TEN-T) until 2023.

Green Hydrogen to Decarbonize Heavy Transport

Iberdrola is spearheading the development of a green hydrogen corridor in the Valencian Community and the Murcia Region. This initiative includes the construction of three hydrogen plants in Valencia, Alicante, and Murcia, each with an electrolyzer capacity of 5 MW. The goal is to generate and supply green hydrogen to heavy road transport fleets, intercity bus fleets, and light industrial vehicles.

This project is distinct from another initiative presented by the company in Zaragoza, which also focuses on transportation. Additionally, Iberdrola is working on a project in the Barcelona Free Trade Zone, where it has been awarded a ten-year contract to build and operate a hydroelectric plant for Transports Metropolitans de Barcelona (TMB) and other fleets and industries in the area.

Furthermore, Iberdrola is leading the effort to develop the first 100% electric Mediterranean Corridor for heavy road transport, in collaboration with the transport and logistics company Disfrimur and the power electronics firm Ingeteam. This corridor will primarily run through the Region of Murcia and the Valencian Community, with plans to extend it to the country’s other freight corridors in the coming years.